Projects

Victory Deposit

Material/Category Open Pit Underground Total
Cutoff Tonnes Grade Gold Cutoff Tonnes Grade Gold Tonnes Grade Gold
(g/t) (kt) (g/t) (oz) (g/t) (kt) (g/t) (oz) (kt) (g/t) (oz)
Millfeed
Measured 0.707 0 0.000 0 1.803 0 0.000 0 0 0.000 0
Indicated 0.707 615,000 2.210 43,700 1.803 2,000 1.848 100 617,000 2.209 43,800
M+I 0.707 615,000 2.210 43,700 1.803 2,000 1.848 100 617,000 2.209 43,800
Inferred 0.707 1,078,000 1.795 62,200 1.803 155,000 3.174 15,800 1,233,000 1.968 78,000
Heap Leach
Measured 0.328 0 0.000 0 0 0.000 0 0 0.000 0
Indicated 0.328 394,000 0.487 6,200 0 0.000 0 394,000 0.487 6,200
M+I 0.328 394,000 0.487 6,200 0 0.000 0 394,000 0.487 6,200
Inferred 0.328 743,000 0.494 11,800 0 0.000 0 743,000 0.494 11,800
All Material
Measured 0 0.000 0 0 0.000 0 0 0.000 0
Indicated 1,009,000 1.537 49,900 2,000 1.848 100 1,011,000 1.538 50,000
M+I 1,009,000 1.537 49,900 2,000 1.848 100 1,011,000 1.538 50,000
Inferred 1,821,000 1.264 74,000 155,000 3.174 15,800 1,976,000 1.414 89,800

Subscribe to our Email List

© 2018 Marathon Gold Corporation
All rights reserved.
Disclaimer