Projects

Sprite Deposit

Material/Category Open Pit Underground Total
Cutoff Tonnes Grade Gold Cutoff Tonnes Grade Gold Tonnes Grade Gold
(g/t) (kt) (g/t) (oz) (g/t) (kt) (g/t) (oz) (kt) (g/t) (oz)
Millfeed
Measured 1.142 0 0.000 0 1.767 0 0.000 0 0 0.000 0
Indicated 1.142 277,000 3.446 30,700 1.767 9,000 2.403 700 286,000 3.413 31,400
M+I 1.142 277,000 3.446 30,700 1.767 9,000 2.403 700 286,000 3.413 31,400
Inferred 1.142 365,000 2.713 31,800 1.767 46,000 2.702 4,000 411,000 2.712 35,800
Heap Leach
Measured 0.281 0 0.000 0 0 0.000 0 0 0.000 0
Indicated 0.281 431,000 0.584 8,100 0 0.000 0 431,000 0.584 8,100
M+I 0.281 431,000 0.584 8,100 0 0.000 0 431,000 0.584 8,100
Inferred 0.281 926,000 0.566 16,900 0 0.000 0 926,000 0.566 16,900
All Material
Measured 0 0.000 0 0 0.000 0 0 0.000 0
Indicated 708,000 1.703 38,800 9,000 2.403 700 717,000 1.712 39,500
M+I 708,000 1.703 38,800 9,000 2.403 700 717,000 1.712 39,500
Inferred 1,291,000 1.173 48,700 46,000 2.702 4,000 1,337,000 1.226 52,700

Subscribe to our Email List

© 2018 Marathon Gold Corporation
All rights reserved.
Disclaimer